Engineering is Underway! Here’s What Barn Pros Will Be Working On Next.
Congratulations! Your barn project is officially underway! Now that the design phase is complete, our engineering team is working hard to tailor the blueprints of your barn, barn apartment or shop to meet all necessary building codes for your region. We’re ensuring that your structure stands strong for generations to come. During this process, we focus on critical structural, architectural, and site-specific details, such as:
- Load calculations for roof, wind, and seismic requirements.
- Roof details, including dormer styles and cupolas.
- Adjustments for insulation, fire safety, and weatherproofing.
- Planning for electrical, plumbing, HVAC, and ventilation if your barn building includes residential components.
While we work on your barn blueprints, you can take proactive steps to prepare your build site, streamline your timeline, and ensure a smooth transition to the construction phase.
Speed Up Your Barn Project Timeline by Handling Site Details Now
As we engineer the blueprints for your barn, you have an excellent opportunity to work on essential site details. Some of these requirements can take time to finalize, so addressing them early can prevent delays. Your local building department will be a great resource for confirming these details. Here’s what you can focus on as you prepare for the next phase of your project:
1. Zoning, Setbacks, and Easements
- Zoning: Confirm that your property is zoned for a construction project of your scope.
- Setbacks: Verify front, side, and rear setback requirements for your project.
- Easements: Ensure there are no easements that could impact the location of your barn project.
2. Utility Planning
- Power:
- Mark your site plan with the power source (existing panel or new service).
- If new service is required, contact your power utility for details.
- If using an existing panel, consult with an electrician to assess capacity and potential upgrades.
- Water:
- Indicate the water source on your site plan (well, shared well, or utility).
- If new service is needed, reach out to your water provider.
- If using an existing source, consult a plumber about the best connection points.
3. Site Access and Driveway Considerations
- If a new driveway is needed to access your barn, barn apartment or shop, check with your county’s public works department to understand requirements and permitting processes.
- Ensure the driveway placement aligns with your planned building location.
4. Further Barn Design Planning and Utility Research
- Plumbing & Electrical Plans:
- Planning these details now will make permitting and construction more efficient.
- Speak with electricians and plumbers to map out your needs.
- Visit showrooms or online stores to select plumbing fixtures and lighting in advance to avoid backorders delaying construction.
- Heat Calculations (and Title 24 in CA):
- Many states require energy loss calculations, which factor in insulation, HVAC plans, and plumbing.
- Your architectural drawings from your client review session is often enough to start this process.
- If you’re in California, be sure to begin Title 24 compliance early.
Get Ahead and Keep Your Barn Project Moving Forward
By addressing these site details as Barn Pros engineers your blueprints, you can significantly reduce delays and be ready for barn construction as soon as your plans are finalized. Proactively managing zoning, utilities, access, and design decisions will help keep your project on track and ensure a smoother barn building experience. Now is the time to take action—so when your barn blueprints arrive, you’re off and running!